REQUEST A PROPOSALMENU
INDOOR / PREFAB
Industrial concrete 3D printer for prefab production
A fixed production environment brings industrial concrete 3D printing equipment, material preparation, curing and handling into one repeatable workflow for prefabricated blocks and architectural products.

PRODUCTION WORKFLOW
From batch preparation to controlled curing
The factory configuration is organised around stable material properties and a predictable flow of concrete to the print heads.

24/7 PREFAB PRODUCTION
A repeatable digital manufacturing cycle
Multiple components are printed layer by layer on a prepared print bed. Dual- or four-head extrusion, conveyor feeding and planned curing bring material preparation, printing and handling into one coordinated production line.
- Multiple components in one machine cycle
- Decorative printed surface on the finished product
- Equipment layout adapted to the product range and facility

MATERIAL DELIVERY
Conveyor feeding without disposable hoses
In a fixed factory setup, the prepared mix is transferred by conveyor to the printer. Smooth-belt construction and cleaning brushes support continuous delivery, while the 200-litre extruder receives material above the print area.
- Planetary mixing and batching
- Smooth-belt concrete delivery
- Interchangeable dual- or four-head extrusion
CONTROLLED CONDITIONS
Designed for repeatable, year-round production
A factory separates the printing process from changing weather and supports a consistent cycle for materials, printing and curing.
Consistent materials
Mix design can be adapted to locally sourced sand, cement and 2–5 mm aggregate, then prepared under controlled production conditions.
Print quality control
Stable material supply, a prepared print bed and programmed paths make it easier to repeat the same component geometry.
Controlled curing
Industrial underfloor heating, steam generation and a retractable chamber are available for planned curing cycles.
FACILITY REQUIREMENTS
A compact production setup
Final layout depends on the selected printer, material system, product handling and curing equipment. The base planning figures are: